The diversified and challenging sub-soil condition and uncontrolled building treatment usually result in defects in piles. This paper identifies the cause of defects and suggests quality control actions for bored cast-in-situ piles.Demolition of the excess concrete above the Lower-off stage shall be performed by operatives applying jackhammers.Disp